
A connected architecture for LPG supply.
The proposed infrastructure is organised in tiers so that supply can move predictably from regional storage to local points of access. All facility illustrations are conceptual.

Regional hubs
Regional hub network pending formal sign-off — planned to receive, store and fill LPG at scale for surrounding states.

State and FCT depots
Proposed network target: depots across the 36 states and the FCT, holding filled cylinder stock close to demand.

Storage and filling
Bulk storage and cylinder filling are planned at hub level, with quality and safety checks recorded digitally.

Route planning
Distribution routes are intended to be planned from depot to franchise point to reduce stock-outs and empty running.

Operational readiness
Each facility is planned to pass permitting, commissioning and staffing gates before it is listed as operational.
Interested in the Gas@Go initiative?
Institutions, technical partners, prospective enterprise operators and media are welcome to get in touch.

