Skip to content
Gas@Go
Conceptual LPG storage tanks and connected pipework

A connected architecture for LPG supply.

The proposed infrastructure is organised in tiers so that supply can move predictably from regional storage to local points of access. All facility illustrations are conceptual.

Conceptual LPG storage tanks and connected pipework

Regional hubs

Regional hub network pending formal sign-off — planned to receive, store and fill LPG at scale for surrounding states.

Gas@Go-branded cylinders prepared for distribution

State and FCT depots

Proposed network target: depots across the 36 states and the FCT, holding filled cylinder stock close to demand.

Gas@Go cylinder connected to a filling nozzle on a calibrated scale

Storage and filling

Bulk storage and cylinder filling are planned at hub level, with quality and safety checks recorded digitally.

Gas@Go delivery truck with secured branded cylinders

Route planning

Distribution routes are intended to be planned from depot to franchise point to reduce stock-outs and empty running.

Nigerian engineer checking LPG pressure equipment

Operational readiness

Each facility is planned to pass permitting, commissioning and staffing gates before it is listed as operational.

Interested in the Gas@Go initiative?

Institutions, technical partners, prospective enterprise operators and media are welcome to get in touch.

View network vision